Showing posts with label Installation. Show all posts
Showing posts with label Installation. Show all posts

Tuesday, July 12, 2011

Vinyl Replacement Windows - A Basic Guide For Installation


New vinyl replacement windows can offer many energy efficient features with virtually no maintenance. A popular upgrade, homeowners can cut heating bills and enjoy smooth easy opening windows while increasing the value of their home. Once measured correctly, replacement windows can then be installed relatively quickly and easily.

Many features are available in new windows and can be purchased custom to fit your openings. Installing them requires very few tools, many of which you may already have. The list should include;

o Utility knife

o Flat bar

o Broad chisel

o Hammer

o Screw gun

o Caulk gun

o Putty knife

o Level

o Step ladder or extension ladder

o Safety glasses

A short list of materials should include;

o Shims

o Interior and exterior caulk

o Drop cloth

o Batt insulation or window and door expansion foam

Prepare a work area to remove the old windows by removing furniture and any window treatments around the old window. Be sure to lay a drop cloth or plastic down to work on, the old window sashes can be very dirty. Begin by removing the old trim around the perimeter of the window. This can be accomplished with a broad chisel or flat bar and hammer. Sometimes the trim has been caulked or painted in and it may be necessary to score the edge with a utility knife before removing. Carefully work the molding out and save the pieces for reinstallation. A common method is "walking" the trim out. Start at an edge and slowly pry a little at a time down the length of the board. With the trim removed the lower window sash can now be removed. Older windows were often fitted with a pulley and rope system. Cut the rope close to the window with your utility knife, letting the weight drop in the void. There should be enough rope to grab when you remove the pulley system later.

To remove the top sash, the parting bead, sometimes called a check stop must be removed. This stop runs between the two sashes. It can be pried out with a dull chisel or flat bar without concern, as it will be discarded. Often the bead will not come entirely out leaving some in the groove it rests in, that's fine as long as the remaining wood is flush with the jamb. Sometimes a small piece of wood is nailed under the window to keep it up in place (making it a single hung window) or there may be more counter weights (double hung). Remove either of these by prying the wood stop out with a flat bar or cut the counter weight rope as before. Care should be taken during this step as there is nothing holding the upper sash in place when stops are removed or the rope cut.

With both sashes removed, check the opening for any obstructions. The wheels that the counter weight rope rested on should be removed and discarded, along with any nails or debris. If possible, pull the weights out and stuff the void with batt insulation. Inspect the outside molding called blind stops. It should be in good shape and continue all the way around the window frame to the sill. This is what your new window will rest on to keep it from falling out. Vacuum the area and remove all the old window sashes, counter weights, parting bead and pulley system from the area, saving the inside window trim.

Unwrap the new window and put any hardware that came with the window and the expansion strip to the side. It should be noted that some units come with a header expander. This article does not include installing the header expander and if included should not be necessary if window is correctly measured and the exterior stops are continuous.

Locate the predrilled screw holes in the side jambs. Normally there are two or three per side, large windows may have holes in the top also. Cut the batt insulation to fit in the window well, approximately 1" thick and place it in the well. Making sure the window sashes are locked, lift the window and place bottom edge in the well. Then push the top of the window into place against the blind stops for a dry run. If the window is extremely tight, it may be best to not push it all the way in; it can be very difficult to take back out. This is where careful measuring pays off. Remove the window and set to the side. Generously caulk all the way around the inside surface of the blind stops. Install the window the same way as done in the dry run. Make sure the unit is centered in the opening and pressed against the blind stops. Now check for level by resting the level on the jamb not the window sash. Window sashes float in guides in the jamb and can give incorrect readings. Shims can be used for adjustments between the unit and the window opening. Use the screws that came with the unit and drive the top ones in first again check for level. Do not overdrive the screws. The lower screws can now be driven and checked for level one last time.

After screws are set, unlock the window and check the operation of the sashes. They should move easily up and down and then lock without much effort. If not, fine tune the screws and shims to adjust for correct operation. If you have tall windows, there may be adjusting posts on the sides to keep the jamb from bowing. Even if the jambs aren't bowing now, adjust these out so they can keep the jambs from moving in the future.

Window and door formulas of expansion foam are great way to fill any gaps and ensure an airtight seal. Care must be taken to lock the window when using expansion foam products and keep them locked and shut during the curing process. After 12 hours, the window can be opened and operated. Do not install trim before curing is complete as any excess foam needs to an escape route to expand. If the installer chooses batt insulation, it can be stuffed in any gaps with a putty knife. It is important not to stuff too much in, as it will bow the jambs and decrease R value.

The trim saved from the tear out phase can now be reinstalled. If new trim is chosen, it will need to be mitered and cut to size. Nail the trim tight to the new window. Caulk between the new window and trim, then between the trim and casings to provide an air tight seal. After the caulk dries, paint can be applied to complete the interior work.

The expansion strip, sometimes called a filler strip should now be cut to size and installed on the outside. This flexible vinyl strip is normally included to compensate for the pitch of the existing window sill and the lower exterior edge of the vinyl window. This strip may need to be cut with a utility knife to match the opening both in length and height. The correct sized filler can now be snapped in a groove at the bottom of the window unit. The installed strip should be tight as possible to the exterior sill and sides of the window opening.

Finally, it's important that no precipitation can penetrate the window opening and must be sealed. Weatherproof caulk must be applied continuously around the perimeter between the vinyl window and the house. Take care there are no gaps for water to infiltrate. With the exterior sealed against the elements and the inside window treatments reattached, you're done. That's it! Enjoy your smooth operating, maintenance free and energy efficient vinyl windows.




The author is a licensed contractor in the state of Michigan and owns and operates PHB Construction LLC.

Paul H. Bilodeau http://www.grandrapids-remodeling.com



This post was made using the Auto Blogging Software from WebMagnates.org This line will not appear when posts are made after activating the software to full version.

Monday, July 11, 2011

Use This Checklist To Be Certain You Are Getting a Quality Replacement Window Installation


The day your replacement windows are installed is a very exciting day. You have shopped for the right window, you have selected the best window installer, and you have waited for your new replacement windows to arrive. Do not get too comfortable though, you still need to insure that the installation is done properly so you realize the full potential of your replacement windows. Use the checklist below to make sure your windows are installed cleanly and correctly.

1. Window is installed level - Reading a level is pretty simple. Have the installer place the level on the sill of the window. In the middle of the level is a small clear tube with two lines drawn around it. Inside the tube is a bubble moving back and forth. If the window is level the bubble will sit in between the two lines on the tube.

2. Window is installed square - To determine if a window is square in the opening you will measure the distance from corner to corner across the diagonals of the window frame. The measurements for each diagonal should be the same.

3. Window is installed plumb - When a window is plumb that means that it is installed in the opening straight up and down, not leaning in or out. Checking a window for plumb is similar to checking if it is level. Place the level on the side jamb of the window so that the level is on the interior side of the window frame. The level should be running up and down on the frame of the window. Instead of reading the center bubble, this time you will look for the bubble that will be located at one end of the level. It is designed to work when the level is straight up and down. Just like checking for level, the bubble should sit in between the two lines on the tube.

4. Sealant is evenly applied on the exterior - Sealant around a replacement window is the barrier that keeps the water out. Verify that there is plenty of sealant applied around all sides of the window. Check to see that there are no holes in the caulk. The sealant should be evenly applied around all sides. Areas with less sealant could dry and crack over time creating a water infiltration problem.

5. Broken glass is removed from exterior - Sometimes when the old window is being removed, the glass breaks. Most installers will make sure to pick up the large shards of glass, but sometimes the tiny pieces get left behind. Check the outside of each window and make sure the small pieces have been vacuumed up. This will insure a person or your pet doesn't get a small piece of glass in their foot.

6. Windows operate properly - Open and close every window to be sure the operating mechanisms are working properly. Practice closing and locking the window to insure it closes easily and that you are able to operate the locks. If the windows have a tilt wash feature for cleaning you should open and tilt every window to make sure they work. If there are any other moving parts on the windows make sure you test their operation prior to the installers leaving.

7. Interior cavity around window is insulated properly - Depending upon how your windows are installed, you may have a gap between the new replacement window frame and the existing wall. To insure proper insulation around the window, this gap should be filled before the trim is applied. This can be done with a low expansion insulating foam or backer rod (a foam strip that can be pushed into the cavity to fill the space) being put into the opening. This will prevent air from coming in around the window and lowering the efficiency of your home.

8. Interior trim is even and corners are tight - One of the last things to be installed on a replacement window is the interior trim. This will surround the window to cover any gaps between the wall and the window and will provide a neat, finished look to the window. You should make sure that all of the trim is evenly applied around the window, making sure it is not waving or has gaps along the trim. Also check to make sure all of the corners are tight miters with no gaps at the corners.

9. Walls around windows show no damage - Make sure there is no cracking on the exterior facade (stucco, brick stone etc.). The interior sheet rock should also be free from any visible cracks or pieces missing. Check every window and point out any damage that you find to give the installer a chance to fix them before they leave the job site. If it can not be repaired by the installer, get a guarantee in writing that the installer will make arrangements to have the damage repaired.

10. All project debris is picked up and removed from job site - This may seem like a no brainer, but you should walk around your house when the job is complete and be certain that all the old window frames, glass, and other debris has been picked up and removed. If it is not in the replacement window contract to remove the garbage, have the installation crew consolidate the trash by your driveway to make hauling it away easier.




Justin M. Howe
The Window Replacement Experts
http://www.window-replacement-experts.com
11765 West Ave. #127
San Antonio, TX 78216
Your San Antonio Window and Door Experts



This post was made using the Auto Blogging Software from WebMagnates.org This line will not appear when posts are made after activating the software to full version.

Wednesday, July 6, 2011

Glass Block Windows - 5 Steps For Installation Success


Like many product categories the installation options for glass block windows have grown proportionately to the expanding design options. Years ago, blocks were made in a 8" x 8" x 4" size in a few patterns and put together inside a masonry window opening (usually by a skilled mason) block by block with a gray mortar and masons sand - not real sexy, but it worked. In today's world people want to use blocks more creatively in different types of openings (could be masonry, framed, steel openings etc.) for a wide variety of uses, and not have to rely strictly on a mason to get the job done. The following 5 installation steps can help you think through what's needed to have your block window installation project go smoothly.

o Step 1 - Ask, "What size is my window opening?"- The size of the opening is a large factor in the window installation approach. There are two basic ways to install a glass block window:

* (Option 1) As a window panel alone, or as a panel built into a vinyl or metal framed window system.

* (Option 2) installing the glass blocks one by one inside of the opening.

A benefit of glass block is it's a heavy material, the challenge is it's a heavy material when you're installing it! For most openings less than 25 square feet consider option 1, the block window built as panel (or section) vs. option 2. Option 2 is usually more difficult, costly, and requires a higher skill level. For the first option you can get a block window panel built by a glass block window manufacturer, often saving time and money.

o Step 2 - Ask, "Where is this block window going?" A key factor in the block window installation is if the glass window is going in new construction or a remodeling project, and whether the surrounding construction is masonry (poured concrete or concrete blocks) or frame (surrounded by wood). Here are some recommendations for each job condition:

* New construction projects in framed openings - For new construction framed openings use a vinyl framed nail in glass block window. Consult your glass window manufacturer for the size to create your rough framed opening. These windows (which are usually siliconed together for an all glass look) can be purchased with nailing fins to simply nail in from the outside just like a traditional vinyl window in new construction. Since they can be manufactured with the 2" thick series of blocks (in either a high privacy "Ice" pattern or "Wave" pattern from Mulia Inc.) they are lighter than traditional block windows. These windows can also be purchased for the 3" and 4" thick series of blocks as well if you'd like to try one of the upscale designed Beveled or Spyra series of blocks from Pittsburgh Corning.

* New construction projects in masonry openings - For most masonry openings under 25 square feet it is best to purchase mortared or siliconed block panels that can be set into the opening and mortared in at the top (also called the head), sides (also called the jambs), and bottom (also called the sill).

* Remodeling projects in framed openings -

- (Option A) If you can adjust your openings to fit one of the vinyl framed glass block windows you can install your project like a standard vinyl replacement window (make sure the window manufacturer takes the window nailing fins off for this type of installation) by placing the vinyl window in the opening, insulating around the window, and installing aluminum coil stock capping to meet the glass block window.

- (Option B) If you can't adjust your existing wood opening then remove the existing window sashes and mortar the glass block into the wood opening and install aluminum coil stock to the block and caulk where the coil stock meets the glass masonry units.

* Remodeling projects in masonry openings (concrete blocks or poured walls) - In remodeling projects measure the entire size of the masonry openings with the existing frame being removed (the only time you don't remove the metal or wood frames is when the frame is either seated over the concrete blocks or poured walls and removing them might cause damage to the surrounding interior or exterior walls). Then size your block window panels to be smaller than the masonry openings (these block windows can be sized basically in any 2" size increment). The window panels can then be mortared into the openings.

o Step 3 - Ask, "What should I use to put the glass block together into a window panel assembly?" - You might have heard varied opinions about how the block panel should be assembled (the most common methods are using mortar or silicone). While some companies may tell you that only one method is correct, they are often just trying to get people to buy the fabrication method they prefer. You should choose that method where the panel size is going to fit best into the opening (making sure the joints do not exceed 1" around the window). Included below you'll find some advantages of both the mortar and silicone systems:

- Advantages of Mortar over Silicone - Mortar is the traditional way to build a block window. The advantages of this system are the ability to vary the size of the mortar joint (helpful when you have an odd size), the mortar joints can be finished to match the existing masonry, and it's very difficult to break a block out of mortared joint.

- Advantages of Silicone - Silicone is preferred if you like an all glass look to your panel, or if you need a smaller window in an opening (silicone joints are smaller than mortar joints), and transportation is safer because the glass window will stay together better than with mortar.

o Step 4 -Ask, "How do I handle an opening greater than 25 square feet?" - When openings become larger than 25 square feet (mostly in commercial, architectural and institutional projects) it is often better to build the window block by block within the opening (this is because the panels would need to become larger, heavier, and are more difficult to handle). With openings of this size you will need to keep the following installation points in mind:

* The window usually requires a "soft joint" at the top (head), and sides (jambs) of the opening - Windows greater than 25 square feet need more space for expansion and contraction requiring glass block caulk be used at the jambs and head of the opening along with an expansion strip. For larger openings an aluminum channel will also help with concerns regarding wind loads.

* Structural steel or aluminum may be required - To allow for wind loads and structural safety larger openings (greater than 20 feet high for 4" blocks and 10 feet high for 3" blocks, and 25 feet wide for 4" blocks and 15 feet wide for 3" blocks) there should be a metal stiffener put into the glass block window. This stiffener could be a metal hidden plate, an I beam, or a T shaped mullion of steel behind the window/wall.

o Step 5 - Ask, "What should I do if my skills or physical abilities don't allow me to do this type of installation?" - Call a specialty glass block contractor or find a nationwide glass block window manufacturer (to make a pre-made glass panel) to make contract out the installation of this window. This will ease the process, reduce cost, and improve the quality of the block window installation project.

Now that you've got the 5 installation steps you're ready to either to get your hands dirty or hire the right specialty glass block contractor for your project.




Mike Foti is President of Columbus Glass Block, Cleveland Glass Block and Mid America Glass Block of Cincinnati, Dayton, and Akron and Vice President Eastern Glass Block of New Jersey and New York. These companies are nationwide suppliers, glass block window manufacturers, and installation contractors of glass block windows, showers, walls, and specialty colored glass blocks. Mike can be reached at the following:

Tel. 614-252-5888 Nationwide 877-668-5888

mfotigb@aol.com

glass block windows

how to install glass block windows



This post was made using the Auto Blogging Software from WebMagnates.org This line will not appear when posts are made after activating the software to full version.